• Projects
  • Services
  • About
  • News
  • Contact Us
  • Projects
  • Services
  • About
  • News
  • Contact Us
  • Home
    • Main Home
  • Pages
    • About Us
    • Contact Us
    • 404 Page
  • Portfolio
    • In Grid
    • Full Width
    • Project Details
      • Side Details – Left
      • Side Details – Right
      • Side Portfolio Gallery
      • Vertical – Details Top
      • Vertical – Details Bottom
      • Vertical Portfolio Gallery
  • Home
    • Main Home
  • Pages
    • About Us
    • Contact Us
    • 404 Page
  • Portfolio
    • In Grid
    • Full Width
    • Project Details
      • Side Details – Left
      • Side Details – Right
      • Side Portfolio Gallery
      • Vertical – Details Top
      • Vertical – Details Bottom
      • Vertical Portfolio Gallery
2 May 2025
  • Bus
  • Commercial
  • EV
  • News
  • Transport

Weston-super-Mare Phase 1 electrification complete

Weston-super-Mare Phase 1 electrification complete

Read More
18 November 2024
  • Architecture
  • Bus
  • EV
  • News
  • Transport

Works have commenced on the electrification of First Bus’s Basildon Depot

Works have commenced on the electrification of First Bus’s Basildon Depot which will provide 60No EV charging points for the new electric bus fleet.

Read More
20 September 2024
  • Architecture
  • Bus
  • EV
  • News
  • Transport

Weston-Super-Mare EV Installation granted Planning Permission

Janus Architecture have obtained planning approval for 3No. Electric Bus charging gantries and associated works at the FirstBus depot in Weston-Super-Mare.

Read More
2 September 2024
  • Architecture
  • Bus
  • EV
  • News
  • Transport

Hilsea Bus Depot granted Planning Permission

The all-new First Bus Hilsea Bus Depot has been granted planning permission by Portsmouth City Council, transforming the former News site in Hilsea, Portsmouth

Read More
3 July 2024
  • Bus
  • News
  • Transport

New Maintenance Workshop in Rochdale

Janus Architecture have designed a new maintenance workshop to allow double decker buses to be maintained at the First Bus depot in Rochdale

Read More
15 March 2024
  • Bus
  • Commercial
  • EV
  • News
  • Transport

Oldham overhead charging gantries complete

Janus Architecture have designed an overhead charging solution within the historic Walshaw Street Depot in Oldham.

Read More
26 October 2023
  • Bus
  • Commercial
  • EV
  • News
  • Transport

Leicester Phase 2 Fully Operational

Phase 2 electrification of Leicester Bus Depot is now fully operational

Read More
9 October 2023
  • Bus
  • Commercial
  • EV
  • News
  • Transport

First Bus completes Phase Two of UK’s largest electric bus depot in Glasgow

We have revisited the UK’s Largest Bus depot in Glasgow installing additional Heliox chargers for the increasing First Bus Electric Bus Fleet.

Read More
15 September 2023
  • Bus
  • Commercial
  • EV
  • News
  • Transport

Aberdeen Depot EV Installation

Janus Architecture have revisited the First Bus depot in Aberdeen to assist with the installation of 24No EV Bus charging stations.

Read More
8 August 2023
  • Bus
  • Commercial
  • EV
  • News
  • Transport

Scotstoun Depot EV Installation Goes Live

Janus Architecture continue to assist FirstBus with their national Bus Electrification programme.

Read More
  • 1
  • 2
  • 3
  • keyboard_arrow_right

Recent Posts

  • Weston-super-Mare Phase 1 electrification complete
  • Works have commenced on the electrification of First Bus’s Basildon Depot
  • Weston-Super-Mare EV Installation granted Planning Permission
  • Hilsea Bus Depot granted Planning Permission
  • New Maintenance Workshop in Rochdale

Recent Comments

No comments to show.
About Us

At Janus we understand that developing a close relationship with our client is paramount to the success of any project. We have a proven track record within a broad selection of work sectors and specialisation in transport projects. Our ability to provide the highest quality design service is demonstrated through the high level of repeat commissions received. We constantly strive to deliver the highest quality of design to meet our clients’ budgets and expectations.

Recent Posts
  • Weston-super-Mare Phase 1 electrification complete
  • Works have commenced on the electrification of First Bus’s Basildon Depot
  • Weston-Super-Mare EV Installation granted Planning Permission
  • Hilsea Bus Depot granted Planning Permission
  • New Maintenance Workshop in Rochdale
Categories
  • Architecture
  • Bus
  • Commercial
  • EV
  • News
  • Newsletters
  • Rail
  • Transport
Tags
Aberdeen architecture Bradford bus busdepot Caledonia creative depot design drone employment EVBus exterior Gantry Glasgow interior Janus Leicester newcastle Oldham opportunity rail rendering simulator store toolset
logo-footer

Gateway Studio
Unit 3A Link 606 Business Park
Staithgate Lane
Bradford
BD6 1YA

+44 (0) 1274 424 884
studio@janusarchitecture.co.uk

  • Home
  • Projects
  • Services
  • About
  • News
  • Home
  • Projects
  • Services
  • About
  • News

© Janus Building Design Limited (T/A Janus Architecture) Registered No: 04022807

Linkedin

Privacy