RATP Dev have now taken possession of a new engineering workshop at their site in Harrow.
The facility provides 3 no. “flatbed” maintenance bays which are to provide improved maintenance for the growing fleet of electric double decker buses and existing diesel fleet.
The project provided significant build challenges being within a fully operational depot and in close proximity to the Metropolitan line to the rear of the site, where night closures were coordinated.
Provision of electric charging both internally and externally was provided by RATP Dev’s preferred contractor and is a continuation of the depot electrification strategy.
At Janus we understand that developing a close relationship with our client is paramount to the success of any project. We have a proven track record within a broad selection of work sectors and specialisation in transport projects. Our ability to provide the highest quality design service is demonstrated through the high level of repeat commissions received. We constantly strive to deliver the highest quality of design to meet our clients’ budgets and expectations.